NTL
Number |
Effective
Date |
Title |
|
2010-G02 |
March 3, 2010 |
Well Records Submittal |
|
2010-G01 |
February 1, 2010 |
Clarification of Deep Gas Royalty Relief Regulation |
|
2009-G40 |
January 27, 2010 |
Deepwater Benthic Communities |
|
2009-G39 |
January 27, 2010 |
Biologically-Sensitive Underwater Features and Areas |
|
2009-G36 |
January 1, 2010 |
Using Alternate Compliance in Safety Systems for
Subsea Production Operations |
|
2009-N11 |
December 4, 2009 |
Air Quality Jurisdiction on the OCS |
|
2009-N13 |
December 2, 2009 |
Inspection Fees for Fiscal Year 2010 |
|
2009-G38 |
December 1, 2010 |
Drilling Windows, Eastern Gulf of Mexico |
|
2009-G35 |
December 1, 2009 |
Sub-Seabed Disposal and Offshore Storage of Solid Wastes |
|
2009-G34 |
December 1, 2009 |
Ancillary Activities |
|
2009-N12 |
November 20, 2009 |
Appeals |
|
2009-G37 |
November 20, 2009 |
Damage from Hurricanes Gustav and Ike (Supplement
No. 2) |
|
2009-G33 |
November 4, 2009 |
Well Naming and Numbering Standards |
|
2009-G32 |
November 4, 2009 |
In-Service Inspection Intervals for Fixed Platforms |
|
2009-N09 |
November 1, 2009 |
MMS Policy on Refund Requests for Service Fees |
|
2009-G31 |
October 21, 2009 |
Hydrogen Sulfide |
|
2009-G29 |
October 13, 2009 |
Implementation Plan for Transition from North American Datum 27 to North American Datum 83 |
|
2009-G28 |
October 13, 2009 |
Alternate Compliance and Departure Requests in Pipeline Applications |
|
2009-N10 |
October 7, 2009 |
Directional and Inclination Survey Data Submission Requirements |
|
2009-N08 |
September 14, 2009 |
Application and Audit Fees for Requests for Royalty Relief or Adjustment Under 30 CFR Part 203 |
|
2009-G27 |
September 9, 2009 |
Submitting Exploration Plans and Development Operations Coordination Documents |
|
2009-G26 |
September 9, 2009 |
U. S. Air Force Communication Towers |
|
2009-G18 |
September 9, 2009 |
Production Safety Systems |
|
2009-G30 |
September 1, 2009 |
Post-Hurricane Inspection and Reporting |
|
2009-G25 |
August 25, 2009 |
Shutting In Producible Wells During Rig Moves |
|
2009-G24 |
August 14, 2009 |
Supervisory Control and Data Acquisition Systems |
|
2009-G23 |
August 14, 2009 |
Structure Assessment Before Moving a Platform Rig |
|
2009-G21 |
August 7, 2009 |
Standard Conditions of Approval for Well Activities |
|
2009-G20 |
August 6, 2009 |
Standard Reporting Period for the Well Activity Report |
|
2009-G19 |
August 5, 2009 |
Containment for Bolted or Welded Storage Tanks |
|
2009-G17 |
August 4, 2009 |
Designated Safe Welding Areas on Rigs |
|
2009-G22 |
August 3, 2009 |
Casing Pressure |
|
2009-G15 |
July 10, 2009 |
Digital Pipeline Location Data |
|
2009-N04 |
July 9, 2009 |
Submitting Semiannual Well Tests Electronically |
|
2009-G16 |
June 25, 2009 |
Global Positioning Systems for Mobile Offshore Drilling Units |
|
2009-G11 |
June 1, 2009 |
Accidental Disconnect of Marine Drilling Risers |
|
2009-G10 |
June 1, 2009 |
Guidelines for Jack-up Drilling Rig Fitness
Requirements for Hurricane Season |
|
2009-G14 |
May 21, 2009 |
Functional Responsibility of MMS Regulations |
|
2009-G13 |
May 20, 2009 |
Guidelines for Tie-downs on OCS Production Platforms
for Upcoming Hurricane Seasons |
|
2009-N03 |
May 12, 2009 |
Posting the Department of the Interior (DOI)
Inspector General's Hotline number at Outer Continental Shelf (OCS) Oil
and Gas Facilities |
|
2009-G07 |
May 1, 2009 |
Location of Choke and Kill Lines on Blowout Preventer Stacks |
|
2009-G05 |
April 27, 2009 |
Approval of Acidizing Operations |
|
2009-G06 |
April 22, 2009 |
Military Warning and Water Test Areas |
|
2009-N02 |
February 10, 2009 |
Timely Submission of Suspension Requests |
|
2009-G04 |
January 27, 2009 |
Significant OCS Sediment Resources in the Gulf of Mexico |
|
2009-G03 |
January 27, 2009 |
Synthetic Mooring Systems |
|
2009-G02 |
January 27, 2009 |
Ocean Current Monitoring |
|
2008-G22 |
November 19, 2008 |
Information Guidance for Availability of Well Data and Information
Through the Gulf of Mexico Region Online Ordering System |
|
2008-N09 |
October 29, 2008 |
Extension of Lease and Unit Terms by Production in
Paying Quantities |
|
2008-G20 |
October 20, 2008 |
Revisions to the List of OCS Lease Blocks
Requiring Archaeological Resource Surveys and Reports |
|
2008-G21 |
October 17, 2008 |
Damage Caused by Hurricanes Gustav and Ike (Supplement) |
|
2008-G19 |
October 2, 2008 |
Changes to the Designation of Operator of an OCS Oil and Gas or Sulphur
Lease |
|
2008-G17 |
September 16, 2008 |
Incident and Oil Spill Reports |
|
2008-N07 |
August 28, 2008 |
Supplemental Bond Procedures |
|
2008-N05 |
August 26, 2008 |
Guidelines for Oil Spill Financial Responsibility (OSFR)
for Covered Facilities |
|
2008-G13 |
July 9, 2008 |
Electronically Stored Records |
|
2008-G07 |
June 15, 2008 |
Managed Pressure Drilling Projects |
|
2008-G09 |
June 1, 2008 |
Guidelines for Moored Drilling
Rig Fitness Requirements for Hurricane Season
|
|
2008-G06 |
May 26, 2008 |
Remotely Operated Vehicle Surveys in Deepwater |
|
2008-G05 |
May 1, 2008 |
Shallow Hazards Program |
|
2008-G04 |
May 1, 2008 |
Information Requirements for Exploration Plans and
Development Operations Coordination Documents |
|
2008-G03 |
April 14, 2008 |
Pollution Inspection Intervals for Unmanned Facilities
|
|
2008-N03 |
March 31, 2008 |
Well Control and Production Safety Training
|
|
2008-N04 |
March 12, 2008 |
Performance Measures for OCS Operators and Form
MMS-131 |
|
2008-N02 |
March 1, 2008 |
Outer Continental Shelf (OCS) Inspection Program |
|
2007-G26 |
December 15, 2007 |
Design of New OCS Platforms and Related Structures
for Hurricane Conditions |
|
2007-G27 |
October 1, 2007 |
Assessment of Existing OCS Platforms and Related
Structures for Hurricane Conditions |
|
2007-N04 |
September 26, 2007 |
Oil Discharge Written Follow-up Reports |
|
2007-G22 |
June 25, 2007 |
Suspensions of Operations for Subsalt and Ultradeep Geophysical Work |
|
2007-G21 |
June 1, 2007 |
Conservation
Information Documents |
|
2007-G20 |
May 25, 2007 |
Coastal Zone Management Program Requirements for
OCS Right-of-way Pipeline Applications |
|
2007-G15 |
May 14, 2007 |
eWell Permitting and
Reporting System |
|
2007-G14 |
May 7, 2007 |
Pipeline Risers
Subject to the Platform Verification Program |
|
2007-G12 |
April 4, 2007 |
Contact with District
Offices and the Pipeline Section Outside Regular Work Hours |
|
2007-G09 |
April 3, 2007 |
Air Emissions Information
for Applications for Accessory Platforms for Pipeline Rights-of-way |
|
2007-G08 |
April 2, 2007 |
Using a Motion Compensator when
Conducting Coiled Tubing Operations on a Floating Production Platform |
|
2007-G07 |
April 2, 2007 |
High Pressure and High Temperature Completions and Workovers |
|
2007-N02 |
March 30, 2007 |
Revised Assessment Matrix |
|
2007-G05 |
March 1, 2007 |
Well Producibility Determinations |
|
2007-G04 |
February 7, 2007 |
Vessel Strike
Avoidance and Injured/Dead Protected Species Reporting |
|
2007-G03 |
February 7, 2007 |
Marine Trash and
Debris Awareness and Elimination |
|
2007-G02 |
February 7, 2007 |
Implementation of
Seismic Survey Mitigation Measures and Protected Species Observer Program |
2006-G16
(Addendum 1) |
February 1, 2007 |
Well Records Submittal (Updated)
Elimination of Paper Copy Data Submittals (Addendum No. 1) |
|
2006-N06 |
December 19, 2006 |
Flaring and Venting
Approvals |
|
2006-G18 |
October 31, 2006 |
Wells (holes-in-the-ground) Without
Assigned MMS API Numbers |
|
2006-G21 |
October 26, 2006 |
Regional and Subregional Oil Spill
Response Plans |
|
2006-G20 |
October 25, 2006 |
Mudline Suspension Wells: Dry Tree
Tiebacks and Conversion to Subsea Wells |
|
2006-G16 |
July 15, 2006 |
Well Records Submittal (Updated)
Elimination of Paper Copy Data Submittals |
|
2006-G04 |
February 22, 2006 |
Fire Prevention and Control Systems
|
|
2006-G01 |
February 1, 2006 |
Royalty Relief for Gulf
of Mexico OCS Oil and Gas Leases with Facilities Damaged by Hurricane Katrina
or Hurricane Rita |
|
2005-G07 |
July 1, 2005 |
Archaeological Resource Surveys and
Reports |
|
2005-G01 |
January 6, 2005 |
Monitoring Bypassed Safety Devices |
| 2004-G06 |
April 5, 2004 |
Structure Removal Operations |
| 2003-G20 |
January 1, 2004 |
Gas Volume Statement Requirements |
| 2003-G02 |
March 3, 2003 |
Ultimate Recovery Abandonment and Bypassing of Zones |
|
2003-G05 |
February 15, 2003 |
Procedures for Submission, Inspection and Selection of Geophysical Data and Information Collected Under a Permit and
Processed or Reprocessed by a Permittee or a Third Party
|
| 2002-N02 |
February 14, 2002 |
Revised Guidelines for Royalty Relief Under 30 CFR
Part 203 |
| 2001-G10 |
November 28, 2001 |
Clarification of Eastern Gulf of Mexico Sale 181 Military Areas Stipulation |
| 2000-G16 |
September 7, 2000 |
Guidelines for General Lease Surety Bonds |
| 2000-G17 |
September 1, 2000 |
Suspension of Production/Operations Overview |
| NTL 99-G20 |
September 7, 1999 |
Downhole Commingling Applications |
| NTL
99-G19 |
September 7, 1999 |
Downhole Commingling Policies |
| NTL 99-G06 |
May 1, 1999 |
Economic Assumptions for RSVP Deepwater Royalty Relief Model |
| NTL 99-G05 |
April 26, 1999 |
Submittal of Documents for Platforms and Structures |
| NTL 98-26 |
November 30, 1998 |
Minimum Interim Requirements for Site Clearance (and Verification) of Abandoned Oil
and Gas Structures in the Gulf of Mexico |
| NTL 98-23 |
October 15, 1998 |
Interim Reporting Requirements for 30 CFR 250, Subpart K,
Oil and Gas Production Rates |
| NTL 98-19 |
September 15, 1998 |
Temporary Abandonment of Wells and Maintenance, Protection, and Removal of Underwater
Casing Stubs |
| NTL 98-08 |
August 10, 1998 |
Meteorological Data Collection (Breton National Wildlife Refuge/Wilderness Area) |
| NTL 97-16 |
August 1, 1997 |
Production Within 500 Feet of a Unit or Lease Line |