OMB Control Number 1010-0058
OMB Approval Expiration Date: November 30, 2010
UNITED STATES DEPARTMENT OF THE INTERIOR
MINERALS MANAGEMENT SERVICE
GULF OF MEXICO OCS REGION
NTL No. 98-26
November 30, 1998
NOTICE TO LESSEES AND OPERATORS OF FEDERAL OIL AND GAS LEASES
IN THE OUTER CONTINENTAL SHELF, GULF OF MEXICO OCS REGION
Minimum Interim Requirements for Site Clearance (and Verification) of
Abandoned Oil and Gas Structures in the Gulf of Mexico
This Notice to Lessees and Operators (NTL) supersedes NTL No. 92-02. It is issued to
update the cited regulatory authorities and to include a statement regarding the Paperwork
Reduction Act of 1995.
This NTL is provided under the authority of 30 CFR 250.104(b). According to
30 CFR 250.105(a), 250.702(i), 250.704, 250.913(a), (b), and (c), and Section 22
of the Lease Agreement pertaining to removal of property on termination of the lease, the
Minerals Management Service (MMS) has established a program designed to ensure that any
object (i.e., wellheads, platforms, etc.) installed on an Outer Continental Shelf (OCS)
lease is properly removed and the site cleared so as not to conflict with other uses of
the OCS.
- Sections 250.702(i) and 250.913(b) of the regulations require lessees (or operators) to
clear all abandoned well and platform locations of all obstructions present as a result of
oil and gas activities. For clearance purposes, the locations are defined as:
- Exploratory or delineation wells drilled with a Mobile Offshore Drilling Unit (MODU) -
The area covered by a 300-foot-radius circle centered on the well.
- Platforms - The area covered by a 1,320-foot-radius circle centered on the platform
geometric center.
- Single well caissons and well protectors - The area covered by a 600-foot-radius circle
centered on the well.
- The lessee (you) must develop and submit a procedural plan for site clearance
verification of platform or structure abandonments (paragraphs 1b and c above) to the MMS
Regional Supervisor, Field Operations, for approval with the permit application for
platform or structure removal. For well abandonments (paragraph 1a above), you must submit
a similar plan to the District Supervisor for approval with the Sundry Notices and Reports
on Well for well abandonment (Form MMS-124). As a minimum, you must verify site clearance
by the applicable method listed in paragraph 2a. Vessels used for site clearance
verification operations must be equipped with a navigational positioning system capable of
providing position accuracy of ±30 feet. The navigational system proposed for use must be
identified in the procedural plan.
- Sites defined in paragraphs 1b and c above and located in water depths less than 300
feet must have their locations trawled over 100 percent of their limits in two directions
(i.e., N-S and E-W) by a trawling contractor who has no corporate or other financial ties
to the company that performed the salvage work. Sites defined in paragraph 1a above need
not be trawled, but must have a high frequency ( 500 KHz) sonar search conducted over the
defined area, and the sonar instrument operating frequency scanning range and deployment
method (stationary or towed) must be stated in the procedural plan submitted for approval.
- Trawling contractors performing site clearance verification work must possess a valid
commercial trawling license from one of the States of Louisiana, Texas, Mississippi,
Alabama, or Florida, for both the vessel and its captain. Further, the captain must have
prior experience in trawling operations.
- The trawling vessel used in verification activities must be equipped with a calibrated
navigation system capable of producing a real-time paper track plot of the vessel position
or capable of producing a hard-copy post plot on board the vessel of all or any specific
lines in order to verify that the area has been satisfactorily covered prior to departure
of the trawling vessel. The track of the vessel on the plot must be shown as a continuous
line and the track plot must have a minimum scale of 1 inch = 400 feet (1:4800).
- The trawling vessel must be outfitted with trawling nets that are representative of the
accepted shrimping industry standard of up to No. 18 twine (ribbon strength) size net
strength. These nets must not be equipped with Turtle Excluder Devices (TED's),
since they may serve as escape openings for objects picked up by the trawl. Trawls are to
be picked up after a maximum drag time of 30 minutes and all shrimp caught in the trawl
are to be released. The Eighth Coast Guard District Law Enforcement Branch should be
notified of any site clearance verification trawling operations (where TED's are not used)
48 hours prior to commencing such activities. Further, when trawling is conducted in areas
where pipelines, shipwrecks, or hangs (i.e., fisherman's contingency fund hangs) are known
to exist, the following guidelines apply:
- There are no restrictions to be placed on the trawling procedure or pattern for
abandoned pipelines. It is the responsibility of the lessee (or operator) performing the
site clearance verification activities to contact the former pipeline owner (or operator)
and determine whether the pipeline will cause an obstruction to unrestricted trawling
operations.
- In general, trawling should not be conducted closer than 300 feet to any existing
shipwreck, but this distance may be reduced depending on the conditions existing at a
particular site.
- Active pipelines that are buried, and for which no obstructions (such as valves) exist
above the mud line, are to be trawled without any restrictions placed on the trawling
procedure or pattern. It is the responsibility of the lessee (or operator) performing the
site clearance verification activities to contact the pipeline owner (or operator) and
determine the condition of the pipelines within the area to be trawled.
- For unburied active pipelines that are eight inches in diameter or larger, and for
unburied smaller diameter pipelines that have obstructions (e.g., valves) present,
trawling must be conducted no closer than 100 feet to either side and in the same
direction as (parallel to) the pipeline. Trawling must not be conducted across the
pipeline.
- For unburied active pipelines that are smaller than eight inches in diameter and have no
obstructions present, trawling is to be conducted parallel to the direction of the
pipeline and trawling on top of the pipeline is acceptable. Trawling must not be carried
out across the pipeline.
- We recommend that the operator or trawling contractor contact the MMS "Fisherman's
Contingency Fund Hangs Data Base" to see if any recorded hangs are located within the
area to be trawled.
- Trawling grid patterns must be as follows for the trawling equipment specified:
- 40-foot grid pattern for vessels trawling with two 50- to 65-foot nets or four 30-foot
nets.
- 60-foot grid pattern for vessels trawling with two 66- to 80-foot nets or four 31- to
40-foot nets.
- 80-foot grid pattern for vessels trawling with two 81-foot or larger nets or four
41-foot or larger nets.
- The Regional Supervisor, Field Operations must approve any modification of the trawling
requirements at a site. You must remove all oil- and gas-related objects encountered by
the trawl from the seabed and report as specified below unless we approve otherwise. You
must remove any snag on a grid line that is not recovered by the trawl and retrawl the
line. For those cases where the trawling effort is interrupted for any reason and then
resumed, specification of the necessary overlap of areas trawled (or to be trawled) to
ensure 100 percent coverage of the location must be at the discretion of the trawling
contractor.
- For a well site (paragraph 1a), you must notify the District Supervisor at least
48 hours prior to conducting the clearance survey. For a caisson or platform site
(paragraph 1b or c), you must notify the Regional Supervisor, Field Operations, at least
48 hours in advance.
-
- Unless we approve otherwise, within 60 days after you complete a platform or structure
removal/abandonment operation, you must complete site clearance verification as specified
in the approved plan. Until site clearance verification procedures have been completed,
you must mark the location as a hazard to navigation in accordance with U.S. Coast Guard
regulations, unless we approve otherwise.
- No later than 30 days after you complete site clearance verification activities, you
must submit all reports, forms, and letters to the MMS. As appropriate, you must include
the following:
- The date(s) the work was performed and the vessel involved.
- A statement from the trawling contractor that no objects were recovered, or categorical
descriptions and estimated size, quantity, volume, and general location of the objects
that were recovered in each category during the trawling activities. The trawler must note
the contents of the nets on each trawling pass. However, objects weighing less than 40
pounds and that are of such a shape or configuration that they are unlikely to snag or
damage shrimping or fishing devices need not be recorded. Categories of recovered debris
to be reported include, but are not limited to, the following:
| (a) pipe |
(d) structural shapes |
(g) long wire rope |
| (b) grating |
(e) large tires |
(h) large hoses |
| (c) plate |
(f) batteries |
|
Additionally, items recovered from diver-assisted snag removals as well
as instances of torn nets must be recorded as described above.
- Details and results of the trawling operations, i.e., post-trawling job plot or map
showing (minimum scale 1"=200') the pattern in which the trawl was pulled, the size
and description of the trawl, grid line numbers corresponding to those used in the
trawler's report, center location latitude and longitude, the positioning system and
calibration method(s) used, and any interruptions experienced during the survey.
- A letter signed by an authorized lessee/operator company representative stating that
he/she witnessed the verification trawling survey (submit with Form MMS-124 or report of
platform or structure removal).
Paperwork Reduction Act of 1995 Statement: The Paperwork Reduction Act of 1995
(44 U.S.C. 3501 et seq.) requires us to inform you that we collect this
information to ensure that any object (i.e., wellheads, platforms, etc.) installed on an
OCS lease is properly removed and the site cleared so as not to conflict with other uses
of the OCS. Responses are mandatory. No proprietary information is collected. An agency
may not conduct or sponsor, and a person is not required to respond to, a collection of
information unless it displays a currently valid Office of Management and Budget (OMB)
control number. We estimate the reporting burden for the collection of information
discussed in this NTL to average 6 hours per response, including the time for reviewing
instructions, gathering and maintaining data, and completing and reviewing the
information. Direct comments regarding the burden estimate or any other aspect of this
notice to the Information Collection Clearance Officer, Mail Stop 4230, Minerals
Management Service, Department of the Interior, 1849 C Street, NW., Washington, DC 20240;
and to the Office of Information and Regulatory Affairs, Attn: Desk Officer for the
Department of the Interior (OMB control number 1010-0058), Office of Management and
Budget, Washington, DC 20503.
This NTL also refers to information collection requirements in 30 CFR 250,
Subpart G, and on Form MMS-124 (OMB control numbers 1010-0079 and 1010-0045,
respectively).
If you have any questions on this NTL, please contact Mr. Arvind Shah at (504)
736-2894.
Chris C. Oynes
Regional Director
Return to Notices to Lessees and Operators